WT Consultancy SW Ltd
  • Home
  • Services
    • ​Workplace Risk Assessment
    • Fire Risk Assessment
    • Asbestos Surveys >
      • Asbestos refurbishment and demolition survey
      • Asbestos management survey
    • Legionella Risk Assessments >
      • Legionella in Engineering Metal Working Fluid
    • Coshh Risk Assessment
    • Health and Safety Audit
    • Health and Safety Consultant >
      • Construction Health and Safety
      • Agriculture Health and Safety
      • Engineering Health and Safety
      • Hospitality Health and Safety
    • food safety consultants
    • HR Services
    • Lifeguard - AI Risk Assessment Tool
    • Asbestos Consultancy
    • Face Fit Mask Testing
    • PUWER Risk Assessment
    • DSEAR Risk Assessment
    • DSEAR Risk Assessment Belfast
    • Contractor Pre Qualification
  • About
  • Contact
  • Careers
  • Training
    • CITB >
      • HSA Health and Safety Awareness
      • SSSTS Site Supervisor
      • SMSTS Site Manager
    • First Aid >
      • Emergency First Aid at Work
      • First Aid at Work
    • Mental Health
    • IOSH >
      • IOSH Managing Safely
    • Asbestos Awareness >
      • Asbestos Awareness
  • Terms and Policies
    • Cookies Policy
    • Privacy Policy
    • Training Terms and Conditions

BLOG

Common Asbestos Survey Questions Answered by Experts

15/5/2025

 

Common Asbestos Survey Questions Answered by Experts

If your building was constructed or refurbished before 2000, asbestos could still be present. Managing asbestos isn’t just about safety - it’s a legal requirement under the Control of Asbestos Regulations 2012 (CAR 2012) in the UK. Here’s a quick overview of what you need to know:

  • Why asbestos surveys matter: They identify the location, type, and condition of asbestos-containing materials (ACMs) to prevent exposure to harmful fibres.
  • Who is responsible: Building owners, landlords, and duty holders must manage asbestos risks, maintain an asbestos register, and create a management plan.
  • Types of surveys:
    • Management Surveys: For routine monitoring of ACMs in occupied buildings.
    • Refurbishment and Demolition Surveys: Required before any structural changes or demolition.
  • Legal risks of non-compliance: Fines, imprisonment, and additional penalties for failing to meet CAR 2012 requirements.
  • Key steps after a survey: Update the asbestos register, implement safety measures, and hire licensed contractors for removal if needed.

Quick Comparison of Survey Types

Aspect Management Survey Refurbishment/Demolition Survey
Purpose Routine monitoring Before refurbishment/demolition
Inspection Method Minimal disruption Fully intrusive
Access Occupied building Vacant area
Sampling Limited Comprehensive
Output Asbestos register and plan Detailed risk report

Staying compliant and safe requires working with accredited professionals and updating your asbestos management plan regularly. This guide will walk you through the essentials of asbestos surveys and how to manage risks effectively.

Types Of Asbestos Survey (Which Do I Need?)

UK Asbestos Laws and Requirements

The UK’s Control of Asbestos Regulations 2012 (CAR 2012) lays down strict rules for managing asbestos risks in buildings. These regulations aim to ensure safety and compliance, particularly in environments where asbestos-containing materials (ACMs) might be present. Let’s break down the key responsibilities and legal implications under CAR 2012.

Survey Responsibility and Duty Holders

Under CAR 2012, duty holders - such as building owners and landlords - are tasked with specific responsibilities to manage asbestos risks effectively. They must:

  • Identify the presence of ACMs in their buildings.
  • Maintain an up-to-date asbestos register.
  • Conduct annual checks to monitor the condition of ACMs.
  • Develop and implement a comprehensive asbestos management plan.
  • Share information about ACMs with anyone who might disturb them.

"The Regulations give minimum standards for protecting employees from risks associated with exposure to asbestos." - Health and Safety Executive (HSE) [4]

Legal Consequences of Non-Compliance

Failing to meet CAR 2012 requirements can result in severe penalties. Since 12 March 2015, the legal consequences include:

  • Magistrates' Court: Unlimited fines and/or imprisonment for up to six months.
  • Crown Court: Unlimited fines and/or imprisonment for up to two years [5].

Additional penalties might involve:

  • Victim surcharge (ranging between £30 and £170, calculated as 10% of the fine) for offences committed after 8 April 2016 [5].
  • Court-mandated remediation measures.
  • Compensation orders to cover injuries or damages caused by non-compliance.
  • Publicity orders in cases involving corporate manslaughter [5].

Residential Property Survey Requirements

In domestic properties, asbestos surveys are generally not required for private homes. However, certain situations demand adherence to CAR 2012:

  • Shared Areas: Surveys are mandatory for communal spaces in residential buildings, such as:
    • Corridors and staircases.
    • Lift shafts and entrance foyers.
    • Communal roof spaces.
    • Shared outbuildings and yards [6].
  • Construction Work: Any building constructed before 2000 requires a refurbishment or demolition asbestos survey before work begins.

"For construction work on any building built before 2000, including domestic/residential properties, a refurbishment and demolition asbestos survey is required." [7]

Additionally, conducting an asbestos survey when purchasing older properties can help identify hidden risks and provide leverage during price negotiations [6]. These measures aim to safeguard both residential and non-residential environments, ensuring compliance and safety across the board.

Survey Types and Uses

Understanding the various types of asbestos surveys is essential for proper asbestos management and compliance with UK regulations. Each survey type serves a distinct purpose and follows specific methodologies to ensure safety and adherence to legal standards.

Standard Management Surveys

Management surveys are the go-to option for routine monitoring of asbestos-containing materials (ACMs) in buildings during normal use. These surveys focus on identifying potential risks from ACMs in accessible areas, with minimal disruption to the building's occupants. They involve visual inspections, limited sampling, and an assessment of material condition to evaluate risks associated with everyday activities.

Here’s what a management survey typically includes:

  • Visual inspection of accessible areas.
  • Minimal sampling of suspected materials.
  • Condition assessment of identified materials.
  • Risk evaluation based on normal building use.
Aspect Details
Inspection Areas Rooms, corridors, stairs, basements, cellars, underfloor coverings, false ceilings, lofts, roofs
Sampling Method Minimal intrusion with limited sampling
Building Status Conducted while the building is occupied
Update Frequency Annual review recommended
Primary Output Asbestos register and management plan

These surveys are suitable for ongoing monitoring, but for structural changes or invasive work, a more detailed survey is required.

Refurbishment and Demolition Surveys

Refurbishment and demolition surveys (RD surveys) are far more comprehensive and invasive compared to management surveys. They are mandatory before any refurbishment or demolition work begins to ensure that all ACMs in the affected area - or the entire building, if demolition is planned - are identified. These surveys adhere to the HSG264 standards set by the Health and Safety Executive.

"A refurbishment and demolition survey is needed before any refurbishment or demolition work is carried out. This type of survey is used to locate and describe, as far as reasonably practicable, all ACMs in the area where the refurbishment work will take place or in the whole building if demolition is planned." - HASpod [8]

Key features of RD surveys include:

  • Invasive and destructive inspection methods to access concealed areas.
  • Extensive sampling and analysis of materials.
  • Evacuation of the area during the survey.
  • Certification of reoccupation once the survey is complete.

When conducting an RD survey:

  1. The area must be completely vacated.
  2. Destructive methods are used to inspect hidden spaces.
  3. Detailed sampling and analysis are performed.
  4. A comprehensive report is produced before any work begins.

This meticulous process ensures all ACMs are identified and managed safely, reducing risks before any structural work is carried out. It sets the stage for implementing safe asbestos handling procedures, which will be explored in the following sections.

Survey Steps and Methods

Pre-Survey Planning

The first step in any asbestos survey is preparation. This includes reviewing building documents and historical records to understand the property's layout and past inspections. Surveyors must also ensure they have full access permissions to avoid delays or incomplete assessments.

Key planning tasks involve:

  • Reviewing documentation: Examine building plans, previous surveys, and maintenance logs.
  • Arranging access: Coordinate with building managers to secure unrestricted site access.
  • Conducting a risk assessment: Identify potential hazards and determine safety measures.
  • Confirming the survey type: Decide whether it's a management survey or a refurbishment/demolition survey.

"The Health and Safety Executive strongly recommends the use of accredited or certificated surveyors for asbestos surveys." [9]

Site Survey Methods

Surveyors rely on various techniques to locate and evaluate asbestos-containing materials (ACMs). The methods used depend on the survey type and must comply with strict safety guidelines.

Survey Component Management Survey Refurbishment/Demolition Survey
Access Level Minimal disruption Fully intrusive
Sampling Density 1–2 samples per area Comprehensive sampling
Occupancy Status Building remains occupied Premises must be vacant
Testing Methods Visual inspection and selective sampling Destructive testing and extensive sampling

The survey process typically includes these steps:

  1. Initial Assessment
    Surveyors perform a walk-through to compare building plans with the site and document suspected ACMs using photographs.

  2. Material Testing
    Samples are collected for laboratory analysis to identify asbestos and determine material density.

  3. Documentation
    The surveyor records the location, condition, and risk level of each identified material, ensuring all findings are accurately captured.

These findings are then compiled into a detailed report.

Survey Report Contents

An asbestos survey report is a vital tool for managing asbestos risks effectively. According to updated guidance from the HSE in March 2021, better reporting has driven a 15% increase in compliance with asbestos management regulations among UK duty holders [1].

The report should include the following key sections:

Section Details
Material Register Lists the location, type, and extent of ACMs
Risk Assessment Evaluates the condition and potential risks
Recommendations Outlines priority actions and management steps
Documentation Includes photographs, sampling results, and site plans
Access Records Confirms areas that were surveyed

The report must provide precise details about ACM locations, quantities, and conditions. It should also include diagrams and photographic evidence to support asbestos management planning. Before finalising, the report should be reviewed for clarity and checked for any unexpected limitations that could impact its usefulness.

sbb-itb-6c77dc5

Understanding Results and Risk Control

Risk Assessment Scoring

Asbestos risk assessments focus on several critical factors to determine the hazard level of identified materials. According to the UK Control of Asbestos Regulations 2012, the control limit is set at 0.1 f/cm³, averaged over a four-hour period [10].

A typical scoring system evaluates three main factors:

Factor Assessment Criteria Implication
Material Type Chrysotile (white) Lower risk
Amphibole (e.g. amosite, crocidolite) Higher risk
Fibre Concentration Below 1% Monitor
Above 1% Immediate action
Material Condition Good/Sealed Lower priority
Damaged/Exposed Higher priority

Fibre concentration plays a key role in safeguarding health and maintaining safety standards [10]. Amphibole fibres, such as crocidolite and amosite, are particularly hazardous due to their needle-like shape, which allows them to penetrate lung tissue more easily. Once the risk level is identified, immediate action is necessary to mitigate potential harm.

Post-Survey Actions

After completing an asbestos survey, several steps should follow to address identified risks:

  • Immediate Containment
    If fibre levels exceed the control limit, secure the affected area with warning signs, barriers, and restricted access to prevent exposure.

  • Documentation and Notification
    Update the asbestos register promptly to reflect any new risks identified during the survey. Ensure building users are informed about the findings and emergency procedures.

  • Management Strategy
    Regularly monitor materials that are in good condition, repair or seal minor damage, and ensure immediate removal of materials in poor condition.

For any asbestos removal, it’s essential to hire licensed contractors who comply with current regulations. After remediation, conduct regular air quality tests to ensure fibre levels remain below the legal limit. This ongoing monitoring is crucial for maintaining a safe environment.

Finding a Licensed Surveyor

Surveyors play a crucial role in ensuring asbestos management complies with the rigorous regulations in the UK.

Required Certifications

In the UK, asbestos surveyors must hold UKAS accreditation in line with BS EN ISO/IEC 17020 [12]. To qualify, a surveyor must have:

  • UKAS Accreditation (listed as an Inspection Body on the UKAS website)
  • Strong quality management systems
  • Proven expertise in asbestos risk assessment
  • Continuous professional development

"Clients should fully instruct and work on the specification with the surveying organisation to ensure they obtain a survey report which meets their needs and expectations and adequately covers all appropriate areas." – HSE [12]

Once certifications are verified, the next step is to assess surveyors based on broader selection criteria.

Surveyor Selection Criteria

When selecting a surveyor, consider the following key factors:

Selection Criteria Required Evidence Importance
Technical Competence Qualification certificates, UKAS accreditation Critical
Quality Systems Written procedures, management protocols High
Experience References, portfolio of similar work Essential
Independence Declaration of impartiality, no conflicts Mandatory
Resource Capacity Staff availability, equipment access Important

Surveyors should:

  • Follow the guidelines in HSG264 'Asbestos: The Survey Guide' [12].
  • Provide evidence of recent projects and client references.
  • Show a clear understanding of surveying risks.
  • Maintain robust quality systems.
  • Operate with complete independence [1].

If you decide to work with a surveyor who isn’t UKAS accredited, you’ll need to perform extra due diligence. This includes requesting:

  • Detailed qualification records.
  • Copies of written procedures.
  • Proof of recent work on similar projects.
  • References from previous clients [12].

Conclusion

Asbestos surveys play a crucial role in ensuring workplace safety and meeting legal obligations in the UK. By pinpointing the exact location, amount, and type of asbestos-containing materials (ACMs) [3], these surveys provide the foundation for creating effective management strategies.

It's essential to work with accredited professionals to guarantee that surveys adhere to regulatory standards [1]. The Health and Safety Executive (HSE) emphasises this in their guidance:

"The survey has to provide sufficient information for a risk assessment, asbestos register and management plan to be prepared." - Health and Safety Executive [2]

Proper asbestos management depends on thorough documentation and strict control measures. To stay compliant and reduce risks, organisations should:

  • Keep an up-to-date asbestos register
  • Review management plans at least every five years
  • Clearly communicate ACM locations to all relevant parties
  • Use proper work permit systems for activities involving ACMs [11][13]

Research shows that inadequate surveys can increase renovation costs by as much as 30% and lead to significant project delays [14]. Even buildings surveyed in the past require regular reviews, especially before any refurbishment or demolition work begins [1][3]. By consistently reassessing risks and following expert advice, organisations can protect their workers and maintain compliance.

FAQs

What should I do if asbestos-containing materials are found in my building during a survey?

If a survey reveals asbestos-containing materials (ACMs) in your building, it's essential to handle the situation carefully to minimise risks. Start by evaluating the location, type, and condition of the ACMs to determine whether they present an immediate hazard. If the materials are intact and unlikely to be disturbed, they can often be managed safely on-site with regular monitoring and a well-documented management plan.

However, if the ACMs are damaged, deteriorating, or at risk of being disturbed, professional removal may be required. Always hire a licensed contractor for such work and ensure the appropriate authority, like the Health and Safety Executive (HSE), is notified. Once the materials are removed, the area should undergo thorough decontamination and air testing to confirm it is safe for use again.

Maintain detailed records of everything, from risk assessments to management plans and disposal documentation, to ensure compliance with UK regulations. These records are not just a legal requirement but also a critical part of ensuring safety.

How do I check if an asbestos surveyor is qualified and accredited in the UK?

To ensure an asbestos surveyor in the UK is properly qualified and accredited, check that they meet the BS EN ISO/IEC 17020 standard. The United Kingdom Accreditation Service (UKAS) is the sole accreditation body recognised by the Health and Safety Executive (HSE) for asbestos surveyors.

Request proof of their competence, training, and experience. It's equally important to verify that they work independently, uphold impartiality, and have robust management and quality assurance systems. These steps ensure the survey is carried out professionally and in line with legal standards.

What are the legal differences between asbestos regulations for residential and commercial properties?

In the UK, the rules for handling asbestos depend on whether the property is commercial or residential. For commercial properties, the Control of Asbestos Regulations 2012 places the responsibility on property owners or managers. They must identify and manage asbestos risks to protect the health of employees, contractors, and visitors.

When it comes to residential properties, the regulations are generally less strict. However, landlords and housing associations could still have responsibilities under health and safety laws, especially if asbestos-containing materials are damaged or pose a danger to tenants.

If you're unsure about what you need to do, it’s a good idea to consult a qualified asbestos surveyor. This can help you stay compliant with the law and reduce potential risks.


Comments are closed.

    Archives

    May 2025
    April 2022

    Categories

    All
    Construction
    DSEAR
    First Aid
    Manual Handling
    Regulations
    Risk Assessment
    Training

WT Consultancy (SW) Ltd, Unit 4, The Hay Loft, Newlands Business Park, Honiton Road, Cullompton, Devon EX15 1BJ
​

​UK South West: 01884 675101
UK Bristol: 01172 141205

UK Belfast: 02895 320799
Email: [email protected]
Chartered Health and Safety Consultancy covering:
Devon, Cornwall, Somerset, Dorset, Bristol and the UK


Company Number: 9784763       VAT Number: 223 4662 25

Privacy Policy      Cookies Policy       Training Terms and Conditions
© COPYRIGHT WT CONSULTANCY (SW) LTD 2025.
​ALL RIGHTS RESERVED.
Picture
  • Home
  • Services
    • ​Workplace Risk Assessment
    • Fire Risk Assessment
    • Asbestos Surveys >
      • Asbestos refurbishment and demolition survey
      • Asbestos management survey
    • Legionella Risk Assessments >
      • Legionella in Engineering Metal Working Fluid
    • Coshh Risk Assessment
    • Health and Safety Audit
    • Health and Safety Consultant >
      • Construction Health and Safety
      • Agriculture Health and Safety
      • Engineering Health and Safety
      • Hospitality Health and Safety
    • food safety consultants
    • HR Services
    • Lifeguard - AI Risk Assessment Tool
    • Asbestos Consultancy
    • Face Fit Mask Testing
    • PUWER Risk Assessment
    • DSEAR Risk Assessment
    • DSEAR Risk Assessment Belfast
    • Contractor Pre Qualification
  • About
  • Contact
  • Careers
  • Training
    • CITB >
      • HSA Health and Safety Awareness
      • SSSTS Site Supervisor
      • SMSTS Site Manager
    • First Aid >
      • Emergency First Aid at Work
      • First Aid at Work
    • Mental Health
    • IOSH >
      • IOSH Managing Safely
    • Asbestos Awareness >
      • Asbestos Awareness
  • Terms and Policies
    • Cookies Policy
    • Privacy Policy
    • Training Terms and Conditions